F1 — Cost and Trade-off (FinOps)#

"You looked at the same cluster in D for how it works; in F you're looking at what it costs."

Block: F — Judgment · Duration: ~10h · Prerequisite: C4, D2

🎯 When you finish this module#

  • You break down a workload's cost into its components (compute, storage, network/egress) and calculate them.
  • You justify a trade-off like right-sizing / spot / reserved with numbers.
  • You defend a cost decision in both engineering and business language.

🧠 Why this, why now#

This block isn't a continuation of A–E, it's the third look. The same systems are now viewed through the lens of money. In C4 you set up the budget alert; F1 turns that awareness into a decision discipline.

📖 Read first#

Source For what Duration
12-FinOps/README.md cost axes: compute / storage / egress, unit cost ~30 min
12-FinOps/Right-Sizing.md tying D2's request/limit to the bill, over-provisioning ~25 min
12-FinOps/Spot-Instance-Strategy.md spot / reserved / on-demand trade-off ~20 min

🔨 Deliverable exercise#

This module isn't pure reading; its output is a written analysis. Pick a workload — the application you ran in D2, or your Capstone 1/Capstone 2 system. Write finops-analiz.md: 1. Break the cost into three axes (compute, storage, network/egress) — with scenario values, not a real bill. 2. Calculate a unit cost (per 1000 requests or GB-month) — write down your assumptions. 3. Propose one optimization (right-sizing / spot / storage class) and show the savings as an absolute difference (before → after). 4. Defend the same decision to the business side in one paragraph (technical + business language).

✅ Acceptance criteria#

Don't move to the next module until all of these are verified: - [ ] finops-analiz.md has a table that breaks cost into three axes (compute / storage / egress) - [ ] A unit cost was calculated with a number, and the assumptions behind it are written down - [ ] An optimization proposal is justified with before → after absolute difference (not percentage, an absolute number) - [ ] The same decision is defended in business language in a separate "Business side" paragraph inside finops-analiz.md (monthly cost + downtime/risk outcome — not just technical terms)

🧪 Test yourself#

  1. Why does the egress bill surprise you while compute cost stays constant, and how do you narrow it down?
  2. A service uses one-eighth of its CPU but has 2 vCPU reserved. What are your first three checks?
  3. For a night-running, interruption-tolerant batch job, which would you pick among spot / on-demand / reserved, and why?
Answers 1. Egress is priced separately in most clouds, and intra-cluster/cross-AZ/internet-egress traffic is billed differently; if a service sends too much data out, the bill balloons even if compute stays constant. Narrowing it down: data localization, caching, compression — [`12-FinOps/Egress-Cost-Reduction.md`](../../12-FinOps/Egress-Cost-Reduction.md). 2. Measure actual usage (D2's metrics / `kubectl top`), bring the request closer to actual usage, then review the node type/count. Right-sizing requires measurement first — [`12-FinOps/Right-Sizing.md`](../../12-FinOps/Right-Sizing.md). 3. Spot: the cheapest option for interruption-tolerant, restartable work, where the job's design absorbs the interruption risk. On-demand wants flexibility, reserved is for predictable continuous load. Batch + tolerant → spot makes sense — [`12-FinOps/Spot-Instance-Strategy.md`](../../12-FinOps/Spot-Instance-Strategy.md).

🆘 If you're stuck#

Symptom Likely cause What to do
You can't break the cost into axes You're looking at a single total number Split the bill into compute / storage / network; write each on a separate line
"Savings" is stated without a number Before/after wasn't measured Write the cost before and after the change separately, show the difference as an absolute number
Right-sizing is done by guesswork Actual usage wasn't measured Go back to the metrics (B2/D2); set the request based on p95 usage, not a guess
The business side isn't convinced Only technical language was used Translate the decision into a business outcome like "X units per month, risk Y downtime"

💼 Portfolio output#

A cost analysis + optimization proposal — proof of L2 decision-making.

⏭️ Up next#

F2 — Threat Modeling + Compliance


"It's not the cheapest architecture that wins, it's the architecture chosen with a knowingly right trade-off."